top of page
android-chrome-512x512.png
20240910 3S_logo.png

NGL Recovery

3S Technology is used to provide NGL recovery and separation from the natural, associated, or flare gas for further sale or own use at the plant, aimed at maximization of production & economic effect.

Residual ngl

Integration of 3S Technology into the existing GPP allows to recover residual NGL from the associated gas.

ngl from flare gas

3S Technology allows to recover NGL from the Flare Gas, adding to revenue & reducing ecological impact.

ngl from own use gas

NGL separation using 3S Technology from gas used for own needs, such as compressors, power generation, etc.

Lower CAPEX & OPEX 
Compared to conventional systems, 3S Technology has low cost of installation, operation, and maintenance. No rotating parts leads to minimal wear and tear.

Efficiency & Compactness

3S Technology provides a compact solution for deep recovery of C3+ fraction. It can be installed on a wide pressure range and is highly tolerant to flow variation.

Quick Payback 

NGL recovery rates along with lower costs, lead to a shorter payback period – typically less than 2 years.

Environmental Effect

Using 3S Technology for NGL separation substantially reduces environmental damage resulting from flaring.

3S vs Alternatives

Criteria*
3S Technology
Turboexpander
Chiller
Essential gas specification limitations
Any pressure range**
Cannot operate on high pressure
At high pressure, a much larger chiller is required
Flow variations tolerance
+/- 15% for single unit, any flow covered by multiple units
No tolerance for flow change
No tolerance for flow change
Extraction %%
up to 96%
up to 99%
up to 90%
Time estimate for design, assembly & installation
6-8 months
12-18 months
12-18 months
Annual maintenance requirements
up to 7 days
30-90 days
30-60 days
Overall installation costs estimate, 40MMSCFD
~$10 mln
~$20 mln
~$15 mln
Annual operating costs
Low
Very high
High
Annual maintenance costs
Minimal
High
Significant
Average Payback period
2 years
5 years
4 years
Other substantial criteria
No rotating parts
Requires reserve unit for maintenance and back-up
Requires external energy supply

* The estimates are based on one of the most recent projects, and may vary depending on various factors, including customization requirements for each project.

** In case of a low pressure, a compressor might be additionally required.

bottom of page